Treasure Coast Model Railroad Club Project Update:
Our current rebuild of the Lima Valley area is well under way. All the track work has been completed and proven. The track power has been connected, turnouts have been wired and electrical panels are completed and operational. The wiring for the track power, turnouts and control panel have completed. The entire area is 100% operational. A scenery design concept has been developed, and construction has commenced.